PROJECTS

24 units. Named, scoped and delivered.

Direct contracts with operators, and subcontracts through the shipyards that serve them. Asset names are published with client approval.

4
Seafox units refurbished
5
Rawabi vessels
8
containers to Zakher

On site: photos from our crews

TOTS crew preparing the main deck of Seafox Deema before coatingSEAFOX DEEMA
Deck preparation before coating
Main deck surface preparation by our crew, under the client’s permit to work.
Night-shift grinding during deck renewal on Seafox BurjSEAFOX BURJ
Deck and helideck sheet renewal
Grinding and welding on a night shift to keep the unit on schedule.
Deck plate repair on Seafox Trident OneSEAFOX TRIDENT ONE
Deck plate repair
Plate repair and recoating of the walkway markings.
HVAC compressor change-out through a hull opening on Rawabi 404RAWABI 404
Compressor change-out
HVAC compressors replaced through a hull opening.
Cassette air-conditioning unit installation on Rawabi 404RAWABI 404
Installation of cassette ACs
Ceiling cassette AC units installed in the accommodation.
Air-handling units fabricated by TOTS loaded on a truck for deliveryAHU
AHU fabrication and installation
Air-handling units built in our workshop, delivered and installed on site.
Screw chiller in the plant room serviced by TOTS for Zakher MarineZAKHER MARINE
Chiller service
Plant-room work on the screw chiller sets.
Refrigeration compressor overhaul for Zakher MarineZAKHER MARINE
Compressor overhaul
Refrigeration compressor overhaul and testing.
TOTS crew fabricating a steel accommodation module in the workshopACCOMMODATION
Module fabrication
Steel accommodation modules framed and fitted in our workshop before lift-out.
Completed stainless steel shower and WC wet unitACCOMMODATION
Stainless steel wet units
Shower, WC and basin units finished in stainless steel.
Crew applying epoxy floor coating in a locker roomFLOORING
Epoxy floor coating
Flake epoxy floors for galleys, laundries and locker rooms.
Corridor with new vinyl flooring installedFLOORING
Corridor vinyl flooring
Vinyl flooring laid and sealed along accommodation corridors.
Non-skid deck coating in progress on an offshore unitDECK COATING
Non-skid deck coating
Surface preparation and non-skid coating applied panel by panel.
Screw chiller overhaul in a ship engine roomHVAC
Ship chiller overhaul
Screw chiller and compressor overhaul in the engine room.

Also in the record

650+ AC units serviced or installed across the portfolio · 10+ barges painted and epoxy floored · galley equipment maintenance and supply · onshore HVAC for Bin Hamm buildings and staff accommodation in Dubai Maritime City · AC works for Premier Marine Engineering Services.

Discuss your unit